{"id":39,"date":"2013-12-06T13:26:58","date_gmt":"2013-12-06T13:26:58","guid":{"rendered":"http:\/\/ideateam.stor.altiweb.no\/?page_id=39"},"modified":"2013-12-06T15:01:42","modified_gmt":"2013-12-06T15:01:42","slug":"references-oil-gas","status":"publish","type":"page","link":"https:\/\/www.ideateam.no\/no\/english-references-oil-gas\/","title":{"rendered":"Utvalgte referanser &#8211; Olje \/ gass"},"content":{"rendered":"<hr \/>\n<figure id=\"attachment_40\" aria-describedby=\"caption-attachment-40\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-40 \" alt=\"GWF_-_TPA_Manifold_BkGrnd\" src=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/GWF_-_TPA_Manifold_BkGrnd-300x172.jpg\" width=\"300\" height=\"172\" srcset=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/GWF_-_TPA_Manifold_BkGrnd-300x172.jpg 300w, https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/GWF_-_TPA_Manifold_BkGrnd.jpg 448w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-40\" class=\"wp-caption-text\">GWF Project \u2013 TPA Manifold \u2013 Pipe Stress Analysis<\/figcaption><\/figure>\n<p><strong><strong>GWF project <\/strong><\/strong><\/p>\n<p>The Greater Western Flank (GWF) area is located on the North West Shelf of Australia over 60km SW of Goodwyn Alpha Platform. The GWF field is consisting of two production manifolds and two skids.<\/p>\n<p><strong>IDEA Engineering AS <\/strong> was given the responsibility by <strong>FMC Technologies Singapore Pte Ltd<\/strong> for performing Large Bore Piping analysis and structural analysis for the Tidepole and GDA manifolds as parts of the Woodside Greater Western Flank (GWF-01) Project.<\/p>\n<hr \/>\n<figure id=\"attachment_44\" aria-describedby=\"caption-attachment-44\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-44 \" alt=\"P1040066\" src=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/P1040066-300x168.jpg\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/P1040066-300x168.jpg 300w, https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/P1040066.jpg 448w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-44\" class=\"wp-caption-text\">Pazflor Subsea Separation Unit &#8211; Testing &#8211; Mounted on Dummy Mudmats<\/figcaption><\/figure>\n<p><strong>Pazflor project <\/strong><\/p>\n<p>The Pazflor consists of three subsea separation units (SSU), at water depth of 800 meters in Block 17 offshore Angola.<\/p>\n<p><strong>IDEA Engineering AS<\/strong> was given the responsibility by <strong>FMC Technologies <\/strong>for performing the structural analaysis and installation analysis for all structural components of the Pazflor Subsea Separation Unit<\/p>\n<hr \/>\n<figure id=\"attachment_47\" aria-describedby=\"caption-attachment-47\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-47 \" alt=\"Tordis_100\" src=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Tordis_100-300x211.jpg\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Tordis_100-300x211.jpg 300w, https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Tordis_100.jpg 623w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-47\" class=\"wp-caption-text\">SSBI Loadout &#8211; T\u00f8nsberg July 2007 &#8211; Photo: IDEA Engineering AS<\/figcaption><\/figure>\n<p><strong><strong>Tordis IOR project<\/strong> <\/strong><\/p>\n<p>IOR = Increased Oil Recovery.<br \/>\nThe Tordis IOR-project is the first commercial full scale subsea separation installation in the world.<\/p>\n<p><strong>Idea Engineering AS<\/strong> was given the responsibility by <strong>FMC Technologies<\/strong> for performing the structural analaysis and installation analysis for the structural components of the follwing units of the Tordis IOR project:<br \/>\n&#8211; Pipeline In-line Module (PLIM) incl. Foundation Bottom Structure (FBS)<br \/>\n&#8211; Subsea Separation Boosting and Injection System (SSBI):<br \/>\nRetrievable Separator Tank Module<br \/>\nManifold Module<br \/>\nFoundation Bottom Structure incl. Integrated Protection Structures.<\/p>\n<p><em> <\/em><em>Have a look at video showing the <a title=\"Installation of SSBI\" href=\"http:\/\/www.youtube.com\/watch?v=Ut0Bh7lBmmA\" target=\"_blank\">installation of SSBI<\/a>. <\/em><\/p>\n<hr \/>\n<figure id=\"attachment_50\" aria-describedby=\"caption-attachment-50\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-50 \" alt=\"Ormen_Lange\" src=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Ormen_Lange-300x199.jpg\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Ormen_Lange-300x199.jpg 300w, https:\/\/www.ideateam.no\/wp-content\/uploads\/2013\/12\/Ormen_Lange.jpg 541w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-50\" class=\"wp-caption-text\">Ormen_Lange FBS &#8211; T\u00f8nsberg Spring 2005 &#8211; Photo: Norsk Hydro<\/figcaption><\/figure>\n<p><strong><strong>Ormen Lange project<\/strong><\/strong><\/p>\n<p><strong>Idea Engineering AS<\/strong> was given the responsibility by <strong>FMC Technologies<\/strong> for performing the structural analaysis and installation analysis for the Foundation Bottom Structure (FBS).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>GWF project The Greater Western Flank (GWF) area is located on the North West Shelf of Australia over 60km SW of Goodwyn Alpha Platform. The GWF field is consisting of two production manifolds and two skids. IDEA Engineering AS was given the responsibility by FMC Technologies Singapore Pte Ltd for performing Large Bore Piping analysis&hellip;<\/p>\n<p><a class=\"more-link\" href=\"https:\/\/www.ideateam.no\/no\/english-references-oil-gas\/\" title=\"Continue reading &lsquo;Utvalgte referanser &#8211; Olje \/ gass&rsquo;\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"open","ping_status":"open","template":"","meta":{"ngg_post_thumbnail":0,"footnotes":""},"class_list":["post-39","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/pages\/39","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/comments?post=39"}],"version-history":[{"count":13,"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/pages\/39\/revisions"}],"predecessor-version":[{"id":75,"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/pages\/39\/revisions\/75"}],"wp:attachment":[{"href":"https:\/\/www.ideateam.no\/no\/wp-json\/wp\/v2\/media?parent=39"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}